GE Vernova · Lifting equipment · Technical inspection

Gantry and jib-crane inspections

Technical inspection of a gantry and a column-mounted jib crane with electric hoists, supported by visual records and functional checks.

Role: Responsible inspection engineer and author of the technical reports.

2025Caetité · Bahia
Column-mounted jib crane and electric hoist in the workshop.
Column-mounted jib crane and electric hoist in the workshop.
The challenge

From observation to technical assessment.

Evaluate the condition and operation of lifting systems used in an industrial workshop, considering the structure, connections, movement, and hoisting components.

Approach

  • Visual inspection of structural members, fasteners, and equipment connections.
  • Assessment of travel elements, guides, hoists, hooks, and wire-rope connections within the inspection scope.
  • Functional checks, photographic records, and maintenance recommendations.

Deliverables

Separate inspection reports for the gantry and jib crane, photographic evidence, recommendations, and ART documentation.

Engineering contribution

Inspection records organized by component to support maintenance decisions and traceable follow-up.

Responsible engineer

Pedro Leonardo Oliveira da Costa.

Project photographs

The work in pictures.

Contact

Let’s discuss your next project.